The Pennsylvania High-Speed Maglev Project Draft Environmental Impact Statement is available
The Federal Railroad Administration has authorized the publication of the Pennsylvania High-speed
Maglev Project (PA Project) Draft Environmental Impact Statement (DEIS) for public review and comment through
December 7, 2005.
The Pennsylvania Project is a 54-mile high-speed maglev line connecting Pittsburgh International
Airport, downtown Pittsburgh and Monroeville and Greensburg, Pennsylvania, with multi-modal stations at these
locations. The entire trip, from the Airport to Greensburg, would take approximately 35 minutes including stops.
During the EIS study, Port Authority and its Project team carefully evaluated several proposed alternative
alignments and conducted a preliminary environmental investigation of the study area. This environmental review
includes an analysis of noise, air quality, and electromagnetic fields, among other studies.
|